Thames Steam Launch "Miranda"

Von Smiffy 3 Einträge 7 Mär 2018 — 16 Jun 2018
8Gefällt-mir-Angaben
0Kommentare
Kapitel 02 / 03

Kapitel · 3 · zum Lesen scrollen

Thames Steam Launch "Miranda"

1st phase complete - keel plus frames and the slot for the stern tube cut and dowelled back together. Now about to cut the bow and stern blocks and begin the hull planking - a skin of 0.4mm ply and mahogany planks on top.
Gefällt von Colin H and figtree7nts

A little progress...

Slow progress recently, partly due to snow(!) but also because I have had some engineering to catch up on. Anyway, I have cut and fitted but not completed shaping the bow and stern blocks, fitted the prop shaft and fabricated the rudder assembly. This was silver soldered using a little piece of 3mm silver steel and sheet and channel brass. Yes, the keel looks a bit of a mess in this area but I am going to cover the ply with mahogany veneer to match the planking when I have completed that, and of course it will all be painted below the water-line. I also made a rough cradle to keep the boat steady while working on it - to be replaced with a posh one when everything is done!
Gefällt von figtree7nts and hightide and
Smiffy Eröffnungsbeitrag 5

Thames Steam Launch "Miranda"

Just in case anybody wondered, I am still alive (!) but have had a very busy couple of months. What with the birth of a 5th grandchild, the baptism of my only granddaughter plus plenty of gardening and additions to my collection of bearded iris there has been llittle time for model engineering or building Miranda’s hull, although the engine is more or less complete and just about running on compressed air. Oh the joys of being retired - no time to do anything!

Delete this post?

Es wird von der Seite entfernt.

Diesen Entwurf verwerfen?

Ihr Entwurf wird gelöscht und kann nicht wiederhergestellt werden.

Sie haben einen unvollendeten Entwurf

Was möchten Sie damit tun?